Building Hoist (SC200/200)

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Beijing
Validity to: Long-term effective
Last update: 2017-12-24 01:03
Browse the number: 82
inquiry
Company Profile
 
 
Product details
Parameters Unit Parameter
Max. Load kg 2× 2000
Max. Passengers
2× 20
Rated Lifting Speed m/min 34.4
Max. Lifting Height m 151
Max. Free End Height of Guides m 7.5
Modulus 8
Carriage Weight kg 1012× 2
Size of Carriage m 3× 1.3× 2.3
Standard Knot Weight kg 146
Dimension of mast section m 0.65× 0.65× 1.508
Motor Model
YZZ132M-4
Rated Power Kw 3× 11 three engines
Rated Rotate Speed r/min 1460
Reducer Center Distance mm 125
Ratio
1: 16
Over speed Governor Type progressive type
Model
SAJ40-1.2A safety device
Operation Speed m/min 51.6
Brake Moment N. m ≥ 3000
Crane Weight t 22
Packing 1-40' HQ
Delivery time 7-15 days
Warranty period One year after the equipment be installed in good condition.
The period and fees of the warranty 1). In the warranty period, the seller will not charge for replacing the broken fittings that caused by the quality and will pay for the mailing fees concerned.
2). In the warranty period, the seller will charge cost only for the replacing fittings which caused reasons of users not keeping products in good condition or operated not in the correct way. The mailing and related fees should be paid by the buyer;
3). When the warrant period is expired, the seller will only charge for cost of the fittings which have been replaced. And the mailing and related fees have to be paid by the buyer;
4). No matter the warranty period is expired or not, should the buyer need the seller’ s engineer to the site of the buyer to deal with the trouble of the equipment, the buyer has to supply an interpreter and pay for the fees of round trip ticket, hotel fees, transportation fees and pay the seller’ s Engineer 30 US dollars per day per person;
Installation and Testing of equipment 1). The Seller will send one of her experienced engineer to the Buyer’ s site to help the completed installation works under the requirement of the Buyer.
2). The Buyer is responsible for the following:
A. deal with the visa for the Seller’ s engineer
pay the round trip air ticket; Boarding and lodging;
a Chinese-English interpreter;
The transportation fees of the engineer in the buyer’ s country;
responsible for the safety of the engineer in the buyer’ s country;
Pay the engineer USD30 per working day as allowance;
3). Preparation work on the site should be done well. Should the reason of buyer or the customer that caused the delay of installation, they have to bear the corresponded fees. The buyer has to fill in an installation contact form by the seller and fax to the seller to ensure the preparation work is well done Before the seller’ s engineer arriving the site of the buyer, Should the engineer of seller arrived the site of buyer but preparation work not done, the related fees should be paid by the buyer;
4). The installation period can be arranged by the seller and the buyer.
Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]